26-05-08

2008.05.26

Production is continuing at full throttle. The crane on George Street was ‘Jumped’ on the weekend. Here are some images of the very complex ties that were designed to allow the tie to fit through the gap in the facade panel. These ties take approximately 90t of pull out force.

2008-05-25_23-03-34-george-street
2008-05-25_23-03-09-george-street
2008-05-25_23-03-01-george-street
2008-05-25_23-00-13-george-street
2008-05-25_22-56-55-george-street
2008-05-25_22-56-20-george-street
2008-05-25_22-56-04-george-street
2008-05-25_22-55-54-george-street