Facade installation is going strong. We are now installing Level Six, The Core is Level 15 & Slabs are being poured to Level 13.
Blackpoint 400 George Street (52) Australia (51) Black Point Irrigation Scheme (7) Construction (76) Isle of Man Incinerator (7) New Zealand (11) Omokoroa (1) Styx Mill (3) UK (7) United Arab Emirates (12) Zayed University (12)
WP Cumulus Flash tag cloud by Roy Tanck and Luke Morton requires Flash Player 9 or better.