23-10-08

2008.10.23

Back to the grind. 

After almost a week away in China on a QA Inspection trip we return to see Level 12 Curtain Wall being installed from Level 14. The double storey floor now clearly visible (some 6m high). The steelwork has commenced, signalling the start of the ‘mad dash’ to get the floor complete by Christmas.  

I use the term very loosely as I have been planning and co-ordinating this floor for almost eight months!! It better go like clockwork.

 