2009.02.07

Here are some of the latest photos showing the job from a different perspective. The Curtain Wall (glass) has now commenced on Level 21. Concrete to the core is up to Level 32 and the floor slabs up to Level 29.

2009-02-06_10-37-21-400-george-street
2009-02-06_10-33-51-400-george-street
2009-02-06_10-33-36-400-george-street