03-03-09

2009.03.03

Almost at the top! The view from 150m up.. 

The small derrick cranes you see to th south are on top of another Skyscraper being built next door.

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • email
  • MySpace
  • Print
  • Reddit
  • Slashdot
  • Technorati
  • TwitThis
  • Twitter
s2mail:

20-02-09

2009.02.20

Things are going crazy!

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • email
  • MySpace
  • Print
  • Reddit
  • Slashdot
  • Technorati
  • TwitThis
  • Twitter
s2mail:

13-02-09

2009.02.15

Well it has been raining all day today – breaks up the monotony of the continual dry weeks. Work is going crazy; the core (where the lifts are contained) is up to Level 32, the slabs to Level 30 and Curtain Wall Level 21.

The podium is now a hive of activity, with Cladding and glazing occuring everywhere. The Plantroom walls on Level 14 are almost complete and the space is slowly getting filled up with plant.

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • email
  • MySpace
  • Print
  • Reddit
  • Slashdot
  • Technorati
  • TwitThis
  • Twitter

06-02-09

2009.02.07

Here are some of the latest photos showing the job from a different perspective. The Curtain Wall (glass) has now commenced on Level 21. Concrete to the core is up to Level 32 and the floor slabs up to Level 29.

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • email
  • MySpace
  • Print
  • Reddit
  • Slashdot
  • Technorati
  • TwitThis
  • Twitter